Much time is lost between the arrival of the core to the surface and in the final determination of basic petrophysical parameters of porosity, permeability and grain density. This is not necessary, especially when the core is consolidated.
Approximately 30% reduction in cost of the Routine Core Analysis project
No additional cost for express service.
One fixed cost for equipment transportation and equipment usage on wellsite whether equipment is on standby or in use
75 % reduction in turnaround time from core receipt till final report.
Selection of zones for perforation on wellsite.
Sample selection for analysis on wellsite.
Determination of water and or oil content without having to preserve the plugs on wellsite.
No core transportation, only plugs are transported for analysis.