Home Mail Us Sitemap
Consultancy Pre & Post tender Audits
Classroom Training
Personnel Recruitment
Lab Design
Reservoir Engineering
Web Based Data Archiving

Pre Coring Planning
Coordinating between drilling, coring and laboratory service companies.


Pre And Post Tender

  • Defining technical requirements in a tender.
  • Define QA / QC protocols.
  • Advise on the best practices.
  • Independently audit the rock properties laboratories for ISO and technical competency.
  • Technically evaluate the bids.


Post Contract Award

  • Design a routine rock properties and SCAL program.
  • Rock Typing.
  • Supervise progress of the project and ensure testing protocols are followed.
  • Monitoring calibration and corrections applied during the testing program.
  • Data re evaluation, if needed.
  • Ensuring that the objectives of the program are met.
  • Integration of results.






 
ICS Field Services ICS Lab Services   ICS Lab Services Equipment Sales
 
Personnel
Portable Spectral Core Gamma
Core Stabilization
Onsite Core Processing
Core Transportation
 
High Resolution CT Scanning
Core Processing
High Resolution Digital Imaging
Residual Saturations by Dean and Stark Method
Grain Density and Porosity
Steady State Gas Permeability
Specific Liquid Permeability
Residual Gas by Counter Current Imbibition
 
 
Amott Wettability
Electrical Analysis
Cation Exchange Capacity
USS Ambient Condition Relative Permeability
Pore Volume Compressibility
Return Permeability
Mineralogy
  ICS Team
Equipment Sales

ICS News & Updates
Conatct ICS